Video quick synopsis:
The ceiling of the first level is the floor of the second level, so the floor joists are visible from below.

Video detailed description:
The ceiling of the first level is the floor of the second level, so the floor joists are visible from below. Wherever there's a balcony, the floor plane decreases slightly to block rain water. The two-story living room volume takes shape adjacent to the lower unit's kitchen. The second floor stairs need to be installed to ascend to level three.

left arrow Last:
First floor framing nears completion while new water and sewer connections to the main are prepared.
  Next:
More framing up to the second floor, new connection to sewer complete.
arrow right

• USE ARROWS ABOVE TO SEQUENTIALLY NAVIGATE ALL VIDEOS

• USE PLAYLISTS BELOW TO JUMP TO SPECIFIC PHASES OF THE PROJECT

Planning + Demolition Rough Construction Finish Construction Landscape + Occupancy
 