More framing up to the second floor, new connection to sewer complete.

Video detailed description:
A quick look at some of the framing progress. The stringers for the steps that lead up to the third floor are in place but lack the treads, and third floor joists have yet to be installed. The new sewer connection is made, and the old connection is capped off.

left arrow Last:
The ceiling of the first level is the floor of the second level, so the floor joists are visible from below.
  Next:
Almost every wall has been framed, and the roof rafters will be next.
arrow right